Driveway Application Form

Construction of concrete vehicular crossing/s by private contractors. 

  • Step One: Fill out the attached PDF form with required information and return to Council 
  • pdf format Construction of Concrete Vehicular Crossing Form August 2016 (391.62 KB)
  • Step Two: Make the required payment for the vehicular crossing application fees at the Council Chambers in line with the current fees and charges. Keep your receipt with the number and date for the form below. 
  • Step Three: Make an online booking using the form below for the 3 technical inspections by a council engineer or his representative, including:
  1. Initial site meeting (PLEASE BOOK THIS MEETING FIRST. AFTER INITIAL, BOOK YOUR PRE-POUR MEETING)
  2. Pre-pouring site inspection (Formwork Inspection)
  3. Final inspection after vehicular crossing construction
  • Step Four: Follow the vehicular crossing engineering specifications during construction as provided with the vehicular crossing application form.
  • Note: If weather does not permit, it is required that you re-book with a minimum of 72 hours notice

Fields marked with an asterisk (Required) are mandatory.

Book Inspection Dates - Customer Details

AddressRequired

Please enter the address of the Vehicular Crossing

I have paidRequired

Initial Site Meeting Booking Time

Please select a time for your initial site meeting (select one time allocation only on either a Tuesday or Thursday next) 

PLEASE BOOK THIS MEETING FIRST. AFTER INITIAL MEETING, BOOK YOUR PRE-POUR MEETING

PLEASE BOOK THIS MEETING FIRST. AFTER INITIAL MEETING, BOOK YOUR PRE-POUR MEETING

Pre-pouring site inspection ( Formwork Inspection)

Please select a time for your pre-pouring site inspection (Formwork inspection) select one time allocation only on either a Tuesday or Thursday next

Final inspection

Please select a time for your final inspection, please select one time allocation only on either a Tuesday or Thursday next